Midtown Toronto is the part of the city centred on Yonge and Eglinton. The City’s Midtown in Focus study drew a boundary around roughly six square kilometres: Briar Hill Avenue and Blythwood Road at the north, Mount Pleasant Cemetery at the south, Bayview Avenue at the east, and Chaplin and Latimer Avenues at the west. Inside that boundary sit Davisville Village, Mount Pleasant West, Chaplin Estates, Sherwood Park and Allenby, with Lytton Park immediately north.
What that means for anyone doing renovation work here is that Midtown is two housing markets sitting on top of each other. Walk two blocks east or west off Yonge and you are in brick houses built in the 1920s and 1930s, on lots laid out when a car was optional. Walk back to Yonge and you are among rental slabs from the 1960s and 1970s and condo towers from the last twenty years. The trades work, the permits and the sequencing are different between the two.
The HandyForce shop is at 1352C Woodbine Ave in East York and 480 Wilson Ave in North North. Depending on how the Don Valley and Eglinton are behaving, that is roughly a 20 to 25 minute drive to Yonge and Eglinton, which matters more than it sounds. Our crews arrive at the start of the day rather than mid-morning, and a project manager can be on your site in the afternoon if something needs a decision. Line 5 Eglinton opened on February 8, 2026 after construction that began in 2011, and the corridor is finally settling back into something like normal.
Most of the ground-related housing between Yonge and Avenue Road, and between Yonge and Mount Pleasant, went up in a fairly narrow window. Davisville Village’s single-family homes were largely built between 1920 and 1930, in brick. Allenby was developed in the 1920s around Allenby Junior Public School, its houses run into the 1940s in Tudor and period styles, and frontages there are commonly 25 to 35 feet with private or mutual drives. Chaplin Estates was subdivided in 1913, with most homes built through the 1920s and 1930s under restrictions that banned semi-detached houses outright and allowed stucco on no more than half of a house’s exterior, which is why so much of it reads as solid brick with stucco only in the gables.
Behind the brick, these houses share a predictable set of problems. Plaster and lath on wood studs, which cracks along the lath lines and will not hold a modern fastener. Knob and tube wiring, which the Electrical Safety Authority notes was used in homes from the early 1900s into the 1940s. It is not illegal, because the Ontario Electrical Safety Code is not retroactive, but many insurers will not write or renew a policy on a house that still has it. Original services that were never sized for a kitchen, an air conditioner and two home offices. We pull ESA permits for this work and do it circuit by circuit; more on our electrical page.
Mount Pleasant West is one of the most building-dominated neighbourhoods in Toronto. Roughly 91 per cent of its residents live in low-rise or high-rise apartment and condo buildings, more than 80 per cent rent, and the 2021 census counted 32,837 people in about 3.1 square kilometres. The buildings span decades: rental slabs from the 1960s and 1970s along Broadway, Roehampton and Erskine, condo towers from the 1990s onward, and the current generation clustered around the new Crosstown stations.
Renovating a unit is a different job from renovating a house, and much of the difference is administrative. Under the Ontario Condominium Act, work that touches common elements or exclusive-use common elements normally requires a Section 98 agreement, approved by the board and registered on title so that it binds future owners. Beyond that, most buildings have their own rules: elevator bookings, permitted work hours, protection of lobby and corridor finishes, certificates of insurance naming the corporation, and limits on core drilling. We sort that out before the first tool goes into the elevator, because a crew turned away at the loading dock costs you a day.
A 1928 semi on Hillsdale Avenue East in Davisville Village had the layout a lot of these houses have: three bedrooms and one bathroom on the second floor, and an unfinished third storey reached by a narrow walk-up stair. The owners wanted a bedroom and a three-piece ensuite up there. The constraints were the ones we see all over Davisville. The house shares a mutual drive with the neighbour, so there was no room for a bin on the property and none to set a lift. Everything went in and out through the front door and up two flights, and we booked a street bin under a City permit for the two demolition days.
We started with the framing. The attic floor was 2×6 joists at 16 inches on centre, fine for storage and not fine for a tiled bathroom, so we sistered full-length 2x8s alongside them and added solid blocking over the bearing walls. The ridge gave about 7 feet 6 inches at the centre, so knee walls were set at 4 feet and the low space behind them became built-in storage rather than wasted floor. The new bathroom went directly above the second floor bathroom, which let us run a 3 inch ABS branch into the existing stack inside the second floor wall cavity instead of chasing a new drain down through finished rooms, with a 2 inch vent out through the roof between rafters. On the electrical side we pulled an ESA permit, ran new 14/2 and 12/2 NMD90 back to a subpanel, and removed the abandoned knob and tube from the top two floors while the walls were open, always the cheapest time to do it.
The rafters were 2×6, so we furred them down and used two inches of closed cell spray foam against the sheathing with batt insulation in front of it, without giving up more headroom than necessary. Opening the second floor walls for the rewire meant plaster repair, done in cut channels with 1/2 inch board, setting compound and a skim coat so the finished wall reads as one surface, the kind of drywall and plaster work these houses always need. In the bathroom: 5/8 inch subfloor plus 1/2 inch plywood underlayment, uncoupling membrane, 12×24 porcelain on the floor, sheet-applied waterproofing in the shower, a linear drain and a fixed glass panel. About six weeks on site, and the family had a working toilet and shower every day of it.
Access is the constraint people underestimate in Midtown. East of Yonge before Mount Pleasant, the lots are smaller and more tightly packed than almost anywhere else in the area, and across Allenby and Davisville a large share of houses sit on mutual drives shared with the neighbour. There is often nowhere to park a bin, so demolition gets staged and bins get street permits for short windows. Scaffold for roofing or brick work usually lands partly on the neighbour’s side, which means a conversation before the truck arrives and plywood over their walkway. On a semi we plan for the party wall too: the neighbour hears everything, so noisy work gets scheduled and communicated rather than sprung on them.
Eglinton Avenue itself has been an access problem for fifteen years. Line 5 runs 19 kilometres with 25 stations and stops between Kennedy and Mount Dennis, more than 10 kilometres of it underground, and construction started in 2011. With the line open as of February 8, 2026 the lane closures have largely lifted, but for properties fronting Eglinton we still confirm parking and delivery windows before we schedule.
The pre-war houses in Davisville, Allenby and Sherwood Park were built with one bathroom, usually carved out of the back of the second floor at about 5 by 7 feet. What we find when we open them is consistent: a cast iron tub set into plaster, no exhaust fan because the window was considered ventilation, a toilet flange sitting on a subfloor that has been quietly rotting, and a supply line reduced somewhere along the way so the shower drops pressure when the kitchen tap runs. The fix is not cosmetic. It is new drain and supply back to a sound connection, a fan ducted through the roof or wall rather than into the attic, and a floor checked for deflection before any tile goes down.
In the towers along Yonge the bathrooms are a similar size but the rules are different. The drain sits in a concrete slab, so moving a toilet is rarely worth the engineering and the board approval it would need, so the layout stays where it is and the value goes into what you can control: a proper waterproofing membrane instead of the old mortar bed, large format porcelain to cut grout lines in a small room, a recessed niche in a stud wall where there is one, and better lighting and ventilation. Our bathroom renovation page walks through how we scope and price it.
Our East York team handles the full range of HandyForce services for Midtown Toronto homeowners.
We serve homeowners across the east end of Toronto. The Midtown Toronto sits at the centre of it – surrounded by neighbourhoods we’ve been working in for years.
Our East York office is at 1352C Woodbine Ave, East York, Ontario M4C 4G2 – about 20 to 25 minutes from Yonge and Eglinton. We’re open Monday to Friday, 9am to 5pm. Call us at 647-427-7366 or toll-free at 1-888-910-7366 or click Request a Quote.